A new 178-bedroom hotel located, on-site, at Birmingham airport.

The hotel was constructed using off-site container technology in order to reduce construction times. The innovative modular construction technique, with parts that included the guest rooms, were manufactured in the Far East and then shipped over for assembly.

SVM BSD developed the Stage 4 design to detailed level. This included all communal areas, service provisions for the bedrooms, plant room and bar.

Challenge
Time restrictions dictated a strict four week install period of the pods. This was down to the 6-week transit time, of the pods, from China.

The design of the hotel’s interiors were frequently evolving which meant lighting / lux levels had to be checked constantly. These changes were predominantly for the bar and restaurant area, so the frequency of monitoring was to ensure compliance with current regulations.

Allocating the routes of the high-level services also proved challenging due to the nature of the structure. To accommodate the heavy loads of the pod containers, the steel structures were a lot deeper than a traditional build. SVM BSD had to find an alternative design strategy to accommodate the high-level services.

Solution
A lot of time was dedicated to on-site monitoring to assist the M&E contractor with install.

Co-ordinating the location of the ground floor plant room with the plant room on the roof of the hotel was critical.

Both plant rooms had to be designed and positioned on the one side of the building to coincide with the riser details.

The ground floor plant room stores the water tank system, separate generator and LV switch room. The roof plant room area is considerably larger and supports the mechanical plant room (boilers) and external condensers.

The Outcome
The Hilton Garden Inn Birmingham Airport is located next to the passenger terminal.

The hotel provides facilities including 178 bedrooms, a 24-hour business centre, a fitness room and two meeting spaces spanning over 800 square feet. Additional amenities at the hotel include changing facilities, a large reception area and a bar and restaurant.

RELATED PROJECTS>

OFF-SITE CONTAINER TECHNOLOGY
TO REDUCE CONSTRUCTION TIMES

CLIENT : LJJ Ltd

ARCHITECT : Hitchman Stone Architects

MAIN CONTRACTOR : Bowmer & Kirkland

M&E CONSULTANT : SVM Building Services Design

VALUE : £20m

Birmingham Airport

SECTOR > HOTELS & LEISURE

Back to Sectors

Four Seasons Hampshire

VIEW PROJECT >

The Four Seasons Hotel is an historic Georgian manor house, set on a 500 acre estate near Fleet in Hampshire. The five star hotel consists of.....

Springfield Park

VIEW PROJECT >

Springfield Park opened as a public park in 1905. The park is 14.73 hectares in size and boasts the striking Grade II listed Springfield House (known as.....

BLOC Hotel

VIEW PROJECT >

Following a successful planning application, SVM BSD were appointed to work collaboratively with Gallant Engineering to develop a complete.....

Hilton Garden Inn

VIEW PROJECT >

A new 178-bedroom hotel located, on site, at Birmingham airport. The hotel was constructed using off-site container technology in order to.....

Wiltham Leisure Centre

VIEW PROJECT >

A new build multi-function leisure centre for Braintree District Council which replaces the 40 year old existing Bramston Sports Centre in Witham.....

Wymondham Leisure Centre

VIEW PROJECT >

The Wymondham Leisure Centre is a large facility which currently consists of offices, a 936m² swimming pool, fitness suite and a 668m² Sports.....

Explore projects >>

HOTELS & LEISURE

Our experience in this sector allows us to effectively collaborate and coordinate with all the specialist skill sets required to produce high quality Hotel and Leisure experiences that are welcoming, attractive, and sustainable.

Balancing the development of complex systems including lighting, acoustics, audio-visual, security, vertical transportation along with the application of energy saving techniques to tackle the efficiency challenges of water and waste.

In summary improving their overall operations to ensure winning outcomes every time.

Projects

Message
Phone
Email
Name

Thank you!

Your message has been sent. We'll BE IN TOUCH WITH you soon.

The Building Society
55 Whitfield Street
Fitzrovia
London, W1T 4AH

london@svm-bsd.co.uk
020 7377 9007

London

<BACK

1 Weekley Wood Close
Kettering
Northamptonshire
NN14 1UQ

kettering@svm-bsd.co.uk
01536 403304

Kettering

<BACK

Suite 210, Fort Dunlop
Fort Parkway
Birmingham
B24 9FD

birmingham@svm-bsd.co.uk
0121 7493509

Birmingham

<BACK

Chiltern House
184 High Street
Berkhamsted
Hertfordshire, HP4 3AP

sales@svm.co.uk
01442 869369


Berkhamsted

<BACK

Suite D2, Magnetic House
Media Village
Waterfront Quay
Salford Quays, M50 3XW

manchester@svm-bsd.co.uk
0161 872 8383

Manchester

<BACK

Stirling House
Cambridge Innovation Park
Denny End Road
Waterbeach
Cambridge CB25 9PB

cambridge@svm-bsd.co.uk
01223 813438

Cambridge

<BACK

Get in touch via the form below or select one of our regional offices to contact us directly.

 London         Kettering         Birmingham         Berkhamsted         Manchester         Cambridge

Get in touch via the form below or select one of our regional offices to contact us directly.

CONTACT US